The CMMS built for the built environment.
From fire alarm panels to the elevator pit — PMCenter ships with the trade-sliced views, compliance registers, and fire-code PM schedules facility operators actually need. One system for FDAS, access, electrical, HVAC, lifts, and fire pump. Ready on day one — no manual setup.
Every trade, one system
Trade-sliced views with colour coding that your maintenance manager and your AHJ inspector both read at a glance.
Fire Detection & Alarm (FDAS)
Addressable panels, SLC loops, notification appliance circuits, clean-agent suppression, fire extinguishers
NFPA 72 / local fire codeAccess Control
Controllers, turnstiles, door readers, visitor management — audit trail from any access head-end
ISO 27001 / local codeElectrical Distribution
Switchboards, sub-distribution boards, UPS, ATS, protection relays — thermography scheduled
NFPA 70B maintenance cadenceHVAC
Air handling units, exhaust fans, chillers, fan coil units, damper actuators, duct sensors
ASHRAE 62.1 / SMACNALifts & Escalators
Passenger elevators, escalators, emergency communications, landing call panels
ASME A17.1 / EN 81 inspection cadenceFire Pump
Diesel / electric fire pumps, jockey pumps, NFPA 20 controllers, FM-200 suppression skids
NFPA 20 / NFPA 25 flow testsBuilt for how facility teams actually work
Fire code compliance, certificate tracking, drills, incidents, and access audits — not bolted on, built in.
Fire-code aligned PM, out of the box
Every PM task carries its regulatory clause. NFPA 72 Table 14.4.3.2 for smoke and heat detector functional tests. NFPA 25 §8 for fire pump weekly churn and annual flow test. NFPA 70B for electrical thermography scheduling. The clause citation is in the task — not in a separate reference binder your technicians never open.

Every PM task cites its code clause. NFPA 72 Table 14.4.3.2 for smoke-head tests. NFPA 25 for fire pump weekly churn.
One register for every certificate
Occupancy permits, fire safety certificates, environmental compliance documents, mechanical inspectorate certificates for elevators and escalators, insurance, and safety program reports — all in one expiry register with next-due dates and a one-click PDF export your AHJ inspector can walk away with. Across a multi-site portfolio, the certification expiry heatmap surfaces what lapses first.

One register. Fire safety, environmental, mechanical inspectorate, insurance, safety program. Expiry heatmap across the portfolio.
Quarterly fire drills — logged, evidenced, exportable
Fire drill records with drill type (evacuation, fire warden, lift entrapment, clean-agent discharge test), attendance count, time-to-evacuate, observations, and corrective actions assigned. One-click drill minutes PDF for the fire safety officer's file and the AHJ inspection binder. The quarterly cadence required by your jurisdiction is enforced automatically.

Drill log with one-click minutes PDF. Type, attendance, time-to-evacuate, observations, corrective actions.
Incidents — the model that fits a building
Facility incidents have their own taxonomy: Genuine Alarm, Device Failure, Barrier Jam, Tamper, Evacuation Drill. Not the ISO 14224 rotating-equipment 5-Why that belongs in a refinery. The model your station manager, your safety officer, and your AHJ inspector all read the same way — with regulatory notification flags on applicable event types.

Facility incidents: genuine alarm, device failure, barrier jam, tamper, drill. The model that fits a building.
Access audit for compliance and insurance
Normalised event stream from your access control head-end. Tamper alerts, after-hours entries, door-held-open violations, and forced-entry events surface as auditable records with timestamps and door identifiers. One log — the same one your insurer, your safety team, and your operations auditor want to see.

Tamper alerts. After-hours entries. Door-held-open. One audit trail from any access head-end.
Thermography that AHJs increasingly ask for
NFPA 70B infrared survey records — hotspot severity classification (Critical, Warning, Normal), equipment linked, photographic evidence attached, and cadence scheduled. The annual thermography scope that insurers and fire marshals are increasingly requiring as a condition of cover. Pre-populated with the right intervals and equipment links — nothing to configure.

NFPA 70B IR survey. Hotspot severity, equipment linked, photographic evidence, scheduled cadence.
Standards alignment
Every PM task, inspection interval, and compliance obligation is traced to its source code or standard.
Ships pre-configured. Not a starting template.
Every compliance obligation, inspection interval, and log structure is built in — not waiting for a consultant to configure it.
| Compliance requirement | Generic CMMS | PMCenter — ships with it |
|---|---|---|
| Fire-code PM schedules | Build task library from scratch | NFPA 72 / 25 / 20 / 70B — clause cited on every task |
| Certificate expiry register | Custom field configuration | Built in — multi-site expiry heatmap |
| Quarterly fire drill log | Not available | Cadence enforced, PDF minutes per drill |
| Facility incident taxonomy | ISO 14224 rotating-equipment model | Genuine Alarm · Device Failure · Tamper · Drill |
| Access control audit trail | Manual log or BMS export | Normalised from any head-end — one log |
| Thermography scheduling | Manual entry required | NFPA 70B cadence, hotspot severity, photo evidence |
| Data population at handover | Manual entry — weeks of setup | PMsync from O&M manuals and BOMs — 2 weeks |
Pick your cadence — your PM, your risk tolerance.
OEM (strictest, from the manufacturer's manual). Compliance (the enforced code floor). Risk-Based (derated for low-risk installations). Custom (override per component). Four presets — one click, full fleet.

One facility, or fifty — one dashboard.
Fleet-wide certification expiry heatmap, per-trade PM compliance matrix, and site rankings. Portfolio operators get the boardroom view your AHJ and your asset manager both want — across every site, every trade, every certificate cycle.
Sites at different commissioning stages show their state accurately — fully commissioned, in-progress, or backbone-only. Nothing is hidden; the gap is visible so you can manage it.


Portfolio view — fleet KPIs (top) · certification expiry heatmap (bottom).
Drop-in connectors. Not replacements.
Your fire alarm head-end, access control system, and BMS stay exactly where they are. PMCenter adds the maintenance and compliance layer on top.
Fire alarm head-end
Notifier ONYXWorks · Siemens Cerberus Pro · Honeywell Gent
Access control head-end
Suprema BioStar · HID · Lenel OnGuard
Building management system
Siemens Desigo · Honeywell CentraLine · Trane Tracer
Fire-marshal portal
Country-specific regulator submission
Environmental regulator portal
Country-specific compliance reporting

Fire alarm head-end · Access head-end · BMS · Regulator portals. Drop-in connectors.
What PMCenter is — and is not
Scope-limiting is a feature. We are the right-sized tool for the facility envelope.
Purpose-built vs configured-from-scratch
Generic EAM and ERP maintenance modules require months of configuration before they are usable for a specific facility type. PMCenter ships with the fire-code, compliance, and trade-sliced structure already in place.
| Capability | Generic EAM / SAP PM | PMCenter |
|---|---|---|
| Time to first PM running | 3–6 months configuration | 2 weeks with PMsync |
| Fire-code PM with clause citations | Manual configuration required | Shipped per NFPA 72/25/20/70B |
| Certificate expiry register | Custom development | Built in, multi-site heatmap |
| Fire drill log with PDF export | Not available | Native — quarterly cadence enforced |
| Incident taxonomy for buildings | ISO 14224 rotating equipment only | Facility taxonomy: alarm, tamper, drill |
| Access audit log | Not standard | Normalised from any head-end |
| Thermography scheduling | Manual entry required | NFPA 70B cadence, photo evidence |
| Data population at handover | Manual entry | PMsync from O&M manuals and BOMs |
Built for every facility type
If it has a fire panel, an access system, and an elevator, it fits.
Works on any device
The same data, accessible from a desk, a tablet on the floor, or a phone in the plant room.

Desktop

Tablet

Phone
Book a demo for your facility.
PMCenter is live. The demo runs now. No sign-up required to explore — select Transit Station and walk through the full platform.