A planned maintenance system built for the engine room
PMCenter gives vessel operators, ship managers, and marine contractors a modern PMS — without the complexity of legacy maritime CMMS software. Main engines, generators, deck machinery, safety systems — all in one place.
Built around the machinery and systems on your vessels
Main Engine
MAN B&W, Wärtsilä, Caterpillar
Auxiliary Generators
Cummins, Perkins, Volvo Penta
Propulsion & Shafting
CPP, FPP, shaft seals, bearings
Steering Gear
Hydraulic, electro-hydraulic, rudder
Bilge & Fire Pumps
Centrifugal, submersible, FIFI
Air Compressors
Starting air, working air, control air
Navigation & Comms
Radar, GMDSS, AIS, GPS
Mooring & Deck Equipment
Windlasses, capstans, cranes, davits
HVAC & Refrigeration
AC units, provision stores, cold rooms
Safety Systems
CO2, fire detection, liferafts, EPIRBs
How marine teams use PMCenter
From vessel commissioning through Class surveys to end-of-life — PMCenter supports the full maintenance lifecycle of your fleet.
Structured PMS from commissioning
Register every machinery item — main engine, auxiliaries, deck equipment, safety systems — in a 3-level hierarchy. Link OEM manuals, spare parts catalogues, GA drawings, schematic diagrams, and technical cross-sections to each component. Handover from shipyard to operator with a complete, ready-to-use maintenance database.
Running-hour and calendar-based schedules
Main engine maintenance triggered at 250h, 500h, 1000h, and annual intervals. Generator overhauls at 4000h, 8000h. Calendar-based tasks for Class surveys, safety equipment inspections, and GMDSS battery checks. All in one system — no separate spreadsheets.
Crew-friendly work orders on any device
Engineers access work orders and work instructions from tablets or phones — on-vessel or at anchor. No paper job cards. Completed tasks are timestamped and logged. The chief engineer sees real-time PM compliance across all machinery spaces.
Spare parts management for long voyages
Track onboard stock for every critical spare — crankshaft bearings, injectors, filter elements, O-ring kits. Set reorder points before departure. Forecast consumption based on upcoming PM tasks. Never arrive at port short of a critical spare.
Class and flag state readiness
Log every inspection, survey, and certification event against the relevant equipment. Breakdowns are recorded with ISO 14224 failure coding — failure mode, cause, mechanism, detection method, and consequence — giving Class surveyors and port state officers the structured data they expect. No scrambling for records during inspection.
Post-handover retention for contractors
Marine contractors who bundle PMCenter into their delivery turn a project engagement into a lasting service relationship. Clients stay connected to your brand through every PM reminder and work order — years after commissioning.
Vessel types supported
Any vessel with machinery that requires a planned maintenance program.
Bundle PMCenter into your next vessel delivery
Engine integrators, harness builders, and electrical contractors can white-label PMCenter under their own brand. Deliver a live maintenance system at commissioning. Stay connected to your client long after the project closes.
Ready to modernize your vessel's PMS?
Try the interactive demo with marine sample data — main engines, generators, propulsion, and deck equipment pre-loaded.